Skip To The Main Content
The Keck Group's Church Pew Refinishing Since 1972

Terry and Bob: We were back in the church last Sunday, and the response to the pews was, as you would expect, everything from spectacular to stunning. Most of the folks can’t believe they’re the same pews! Thanks to you, Bob and your crew for a seamless, pain free experience. I commented to some of the parishioners last night that working with The Keck Group was a great pleasure, as the quality of work is plainly evident, and everything unfolded precisely as scheduled; as you know, not every contractor works that way!

Fr. George Hafemann

St. Patrick’s Cathedral/NY NY:

by The Keck Group | Dec 26, 2017
st-patricks
The Keck Group is once again back at St. Patrick’s in 2017 employing a modern epoxy-based anchoring system. 
Additionally, the Lady Chapel has been removed, as well as all of the South Transept Pews, to facilitate a heavy duty ramp from 51st street, through the south doors, across the nave, and up the stairs to the hallway surrounding the sanctuary.  Heavy glass panels are being erected at the entrance of the Lady Chapel in order to secure a somber relevance to the space, rather than the original wide open entrance.
Although we refinished the Lady Chapel pews twenty years ago, the Cathedral wanted to match them to the recently refinished pews in the nave and transepts, so this was accomplished prior to reinstallation.  Included were new kneelers and Atwood Hamlin Pew Form Cushions..
Work was completed in early October, 2017.